The facility would likely need to select the relevant facility production types within a single module. As a vertically integrated facility, only ONE FEM needs to be completed, and the wastewater results would be common for both facilities. For the energy, water, and waste sections, reporting would be separated, but the wastewater section would not be separated for vertically integrated facilities.