The facility should select Finished Product Assembler AND Material Production.
"Material Production (Raw and intermediate materials are transformed into their final state before assembly)".
The facility should select Finished Product Assembler AND Material Production.
"Material Production (Raw and intermediate materials are transformed into their final state before assembly)".