Skip to main content
-
If an operating license is not legally required in my facility, how can I respond to the question about the operating license?
-
What is the annual volume referring to in Higg FEM 4.0? Is it referring to production volume or shipped volume?
-
In case a facility chooses both Finished Product Assembler and Finished Product Processing, will the energy and water section require such facilities to report the data separately for both?
-
What will be the facility type as per the Site info section of Higg FEM 4.0 for the Leather goods manufacturer facility?
-
Can a label manufacturing facility, using pieces/pair as unit of measurement, continue to use the same unit of measurement and report in Higg FEM 4.0 as they have multiple items with different sizes and material GSM.
-
If a facility has only cut-sew and in-house garment laundry, what is the facility type they should choose in the Site Info & Permits section?
-
If a facility is getting the wastewater treated by an offsite ETP and they are not willing to share their test reports/permits with us, would it result in a Zero score in the FEM?
-
My facility operations include both finished garment assembly and laundering, which unit of measure should I report in?
-
Our factory has a printing division, in response to facility type, should we select Finished Product Assembly only, or include other Finished Product Processing (Product Printing, Painting, Dyeing, Laundering, and finishing)?
-
How do I respond to the individual permit requirements if I have an Integrated Environmental permit?
-
What does an Integrated Environmental permit refer to?
-
My facility operations include both finished garment assembly and laundering and we are required to input energy values separately. However, our invoice provides a single combined value for the entire factory, how should we proceed?
-
My environmental permits are currently expired but renewal is in progress, how should I respond to the assessment?
-
My government permit expired, and they no longer issue it. Should I mark it as "not required" on the assessment?