Skip to main content
Worldly Training & Support Help Center home page Worldly Training & Support
  • Submit a request
  • Sign in
  • Sign in
  • Submit a request
  1. Worldly Training & Support
  2. FEM 4.0 Frequently Asked Questions (FAQ)
  3. Site Info & Permit

Site Info & Permit

  • If an operating license is not legally required in my facility, how can I respond to the question about the operating license?
  • What is the annual volume referring to in Higg FEM 4.0? Is it referring to production volume or shipped volume?
  • In case a facility chooses both Finished Product Assembler and Finished Product Processing, will the energy and water section require such facilities to report the data separately for both?
  • What will be the facility type as per the Site info section of Higg FEM 4.0 for the Leather goods manufacturer facility?
  • Can a label manufacturing facility, using pieces/pair as unit of measurement, continue to use the same unit of measurement and report in Higg FEM 4.0 as they have multiple items with different sizes and material GSM.
  • If a facility has only cut-sew and in-house garment laundry, what is the facility type they should choose in the Site Info & Permits section?
  • If a facility is getting the wastewater treated by an offsite ETP and they are not willing to share their test reports/permits with us, would it result in a Zero score in the FEM?
  • My facility operations include both finished garment assembly and laundering, which unit of measure should I report in?
  • Our factory has a printing division, in response to facility type, should we select Finished Product Assembly only, or include other Finished Product Processing (Product Printing, Painting, Dyeing, Laundering, and finishing)?
  • How do I respond to the individual permit requirements if I have an Integrated Environmental permit?
  • What does an Integrated Environmental permit refer to?
  • My facility operations include both finished garment assembly and laundering and we are required to input energy values separately. However, our invoice provides a single combined value for the entire factory, how should we proceed?
  • My environmental permits are currently expired but renewal is in progress, how should I respond to the assessment?
  • My government permit expired, and they no longer issue it. Should I mark it as "not required" on the assessment?
Worldly Training & Support
Español Italiano 日本語 Português Türkçe Tiếng Việt 简体中文