Skip to main content
-
In the 2024 Higg FEM, if the facility achieves L1, will L2 and L3 questions be scored?
-
When L2 and L3 questions open as optional, is there a clear indicator to the person completing the assessment that the sections are optional and will not be scored?
-
Is the scoring methodology for both self and verified assessments the same for 2024 as it was for FEM 2023?
-
Do only L1 questions count towards the total score?
-
If all L1 questions can be answered with "yes" can a facility achieve full score on the Higg FEM irrespective of L2 and L3 responses?
-
If a facility does not participate in the trainings, and doesn't receive a certificate, will it affect the FEM score?
-
How soon can the score be viewed once FEM2024 and FSLM self assessment are uploaded?
-
Are any bonus points awarded to facilities that have answered L2 and L3 questions based on their self assessment?
-
Can a trader (regional offices) apply for a wordly account to review facility's scoring?
-
If the facility’s answer to the main question does not open sub-questions, how is that question scored?
-
How can we compare scores year over year with scoring changing and questions added? Does this not demotivate environmental teams?
-
On FEM 2024, are self-assessment and verification scores calculated based on L1 questions only? Are L2 and L3 optional and unscored?
-
Are brands allowed to publicly disclose average Higg FEM and vFEM scores?
-
Why does my FEM score rounded down from my CSV score?
-
Our factory does not produce industrial wastewater, only domestic. It is sent to septic tank and treated offsite through an MOU with a 3rd party. Since we don't have onsite wastewater treatment and permit, will we score zero for this section?
-
Why does my FEM score show as zero even though I have provided answers for all the questions?
-
On Question 6 of the Water Section "refID: watgroundlegalreq" how is it scored if the answer is "unknown"?
-
Is score impacted if a facility cannot demonstrate consumption reduction on a target year?
-
Where can we find a list of the FEM questions outlining the score of each and its section?
-
In the air emission module, if an industry uses coal for energy but effectively controls their emissions through measures, will they still receive full marks, as opposed to industries that do not use energy sources emitting pollutants, such as coal?
-
If the facility has an expired environmental permit that is under renewal, will the facility score 0 for the entire module?
-
Could an industry using coal still achieve full marks by providing an acceptable coal phase-out plan, as opposed to industries that do not use coal as an energy source?
-
In the new HIGG FEM 4.0 Energy module, new questions have been introduced regarding the phase-out of coal. Would choosing coal as an energy source result in a deduction of scores in the assessment?
-
Where can we find more detailed guidance on the scoring?
-
How might scoring be impacted if we update our baselines, targets and objectives based on the number of updates and changes on the FEM version 4.0?
-
As some brands or customers require a minimum score, is there a way to see our score before submission of the assessment?
-
How can we view the questions on the FEM that might not be applicable to our processes, in order to understand any potential that might exist for improving our score?
-
Our facility plans to increase renewable energy sources by setting up solar panels within this year. Would this plan help us to score higher on the FEM this year?