Chuyến đến nội dung chính
-
Is the facility's GHG emissions included in a broader corporate disclosure? If so, give an example of broader corporate disclosure.
-
Under Facility Material Processes: Chalk refinement/crushing - Prepreg lamination - RTM - Wet lay-up (various fibre), none of these are available for our company. If I don’t select one, the verification will not reach 100% result. What should I do?
-
What is SAM and how is it calculated?
-
What is the difference between finished product assembler and Finished Product Processing?
-
The factory's surrounding ground surface is completely constructed with concrete. Is testing required to identify the soil vontamination or not? For Cut to Pack Facility, what is frequency to conduct the soil testing since there is no wet process?
-
What should I choose if we are a cut-sew-inspect-pack textile company and dispatch garments only?
-
Our footwear factory produces finished shoes and rubber outsoles. Rubber outsole production is only for factory assembly use, not for sale. For facility type, should we select both finished product assembler and material production and processing?
-
We have selected more than one facility type in sipfacilitytype, but as we cannot separate consumption between the two, why do the subsequent questions and tables in both energy and water sections indicate only one of the facility types entered?
-
Can we share the business license to our new facility?
-
As an entity that purchases fabric from mills then sells to garment factories, which facility types should be selected on their FEM?
-
We're a finished product assembler but we have heat transfer (for printing logo). Should we select "Finished Product Assembler" and "Finished Product Processing (Product Printing, Product Painting, Product Dying, Product Laundering and Product Finishing)?
-
What would be the best option to select to identify packaging related materials within the Material Types section?
-
If the factory is a fabric manufacturer with yarn or greige fabric as raw materials (including viscose fabric) and dyed fabric as finished goods, does it classify as producing MMCF?
-
If a garment factory uses heat transfer (for logo printing), should the printing process also be selected?
-
If an operating license is not legally required in my facility, how can I respond to the question about the operating license?
-
What is the annual volume referring to in Higg FEM 4.0? Is it referring to production volume or shipped volume?
-
In case a facility chooses both Finished Product Assembler and Finished Product Processing, will the energy and water section require such facilities to report the data separately for both?
-
What will be the facility type as per the Site info section of Higg FEM 4.0 for the Leather goods manufacturer facility?
-
Can a label manufacturing facility, using pieces/pair as unit of measurement, continue to use the same unit of measurement and report in Higg FEM 4.0 as they have multiple items with different sizes and material GSM.
-
If a facility has only cut-sew and in-house garment laundry, what is the facility type they should choose in the Site Info & Permits section?
-
If a facility is getting the wastewater treated by an offsite ETP and they are not willing to share their test reports/permits with us, would it result in a Zero score in the FEM?
-
My facility operations include both finished garment assembly and laundering, which unit of measure should I report in?
-
Our factory has a printing division, in response to facility type, should we select Finished Product Assembly only, or include other Finished Product Processing (Product Printing, Painting, Dyeing, Laundering, and finishing)?
-
How do I respond to the individual permit requirements if I have an Integrated Environmental permit?
-
What does an Integrated Environmental permit refer to?
-
My facility operations include both finished garment assembly and laundering and we are required to input energy values separately. However, our invoice provides a single combined value for the entire factory, how should we proceed?
-
My environmental permits are currently expired but renewal is in progress, how should I respond to the assessment?
-
My government permit expired, and they no longer issue it. Should I mark it as "not required" on the assessment?