Chuyến đến nội dung chính
-
Will I lose points if I answer 'no' to a question in the FEM?
-
In FEM 4.0 module, no clause number was indicated in any question. Could this be added to the platform?
-
Can I download all FEM4.0 data in bulk?
-
Is the Bulk CSV V2 export available for FEM4.0?
-
Where can I download FEM data?
-
Is verification required, and if so, is there a deadline for submitting the vFEM module?
-
As a brand, when we ask our facilities to share their modules, what level of detail will we see?
-
As a brand, can I request modules in bulk if I work with hundreds or thousands of facilities?
-
How can we search for modules we would like to be shared with us?
-
How can parent companies access their factories' Higg data?
-
As a facility, if I have already completed the FEM in the past, do I need to reshare after purchasing the new FEM?
-
Are all team members in my account able to share and accept FEM modules?
-
What information is shown through module sharing?
-
How does module sharing work?
-
What has changed with FEM 4.0?
-
What if two factories are located in the same place and have only one water meter for two factories? Can we have one account for two factories?
-
We have a few production units that are using the same business license from parent company (i.e. they do not have their own business license), can it be considered as a valid business license?
-
What happens if my facility moves locations or majorly redo the premises?
-
How long does it take to complete a module?
-
Can my facility repeat the FEM Foundations if it was already completed in a previous year?
-
What are the changes to the dropdown menu in the FEM country category?
-
Where can I learn more about the "Critical risk" section and how those are defined in the "Areas of opportunities" part of the FEM. Is there a guidance document I can review?
-
What are the rules around using a single Higg ID for a large site that currently has multiple Higg IDs?
-
As a brand, where can I bulk download the FEM data from my facilities?
-
As an apparel manufacturing facility, with sewing, packing, and warehousing operations, do we need to track and report energy separately? How do we track consumption/reduction for multiple facility processes energy, waste, water etc?
-
What does one time posting mean?
-
Is SAC Membership required in order to purchase and use the new FEM?
-
What does the term cadence mean?
-
Which tool would you recommend to be able to track progress and verify if a supplier has good environmental performance?
-
Where can I find more information on the SAC membership requirements?